Location: Port Sudan, Sudan
Management: TheOceanRoamer | Prof. Sheikheldin el Amin
Current Status: ACTIVE
Create natural, monitored and managed safe spaces for Sudan's marine fauna and flora. Extend the life span, and restore extinction threatened species to healthy populations, ready for transplantation. By reinforcing, and repurposing local infrastructure available in Port Sudan. And implement a constant monitoring and live research program in the Sanganeb - Shaab Rumi - Wingate triangle.
“THE VAULT” Biodiversity Restoration Project Phase 1 |
|||||
Activity |
Activity description |
Activity output/deliverable |
Indicator/Target |
Cost items |
|
1.1 Research / Basic Shield Wingate Reefs |
Research the extent of coral bleaching, biodiversity loss, general health of the shallow reefs. Identifying safe areas that are suitable for biodiversity restoration General Underwater mapping Install Fixed Moorings on hotspots like Umbria, shaab el erg, shaab talata Create a good practices campaign to be installed near 2 tourist harbors |
General Bio health and diversity map layer – Google Maps
Report with pictures and dive logs/attendance |
Wingate natural Coral nursery locations identified. |
Dive Team and Boat operating costs.
Divers’ stipendiums, fuel Mooring Materials Signage |
|
1.2 Research/ PZU infrastructure |
Review possible seaside locations, that can be used for DNA Extraction, Storage and Assisted Nurseries for corals. Possible locations: Sigala (Fishing Harbor) |
Location reports |
Infrastructural Plan |
Scientific Consultant, Project Developer consulting fees
Transportation |
|
1.3 Research / Sanganeb Atoll |
Research and compile an infrastructural development report, adequate for operational needs of phase 2. General health assessment of the reef biodiversity, reviewing current impacts on deep water reefs. Identifying general biodiversity restoration locations.
|
General Bio health and diversity map layer – Google Maps Report with pictures and dive logs/attendance |
Sanganeb Atoll General Zoning plan |
Dive Team and Boat operating costs.
Divers’ stipendiums, fuel |
|
1.4 Development |
Compilation of research data, revision of VAULT strategy for the next 5 years. Setup of Digital Monitoring & Reporting Infrastructure |
Comprehensive project expansion documents. Website/Extra-Intranet |
Architectural, Operational, Management plan 5 years Joint reporting website |
Consultancy fee’s, communication costs Hosting – Development Fee’s |
|